AC
Aigarth Tracker

Overview

Live state of the Aigarth Cloud build. Source of truth for what's outstanding.

Overall progress
88%
193 / 219 tasks done
In progress
2
26 phases total
Documents
55
All in workspace/now/docs/
Open tasks
26
Across all phases
Recent activity
Last 10 events in the tracker
  • Aigarth Cloud Evolution PEP registered with command centre (3 docs). Status: draft. Pending architecture review.
    8/11/2026, 12:45:06 AM
  • Doc added: Aigarth Cloud Evolution PEP — From Neural Networks to Evolving Useful Intelligence
    8/11/2026, 12:44:18 AM
  • Doc added: Aigarth Cloud Evolution PEP — Executive Summary
    8/11/2026, 12:44:18 AM
  • Doc added: Aigarth Cloud Evolution PEP — Roadmap Impact
    8/11/2026, 12:44:18 AM
  • Aigarth Cloud Evolution PEP registered with command centre (3 docs). Status: draft. Pending architecture review.
    8/11/2026, 12:44:18 AM
  • Phase 25 — Aigarth CLI (agent-grade) registered. 8 tasks, ~8 SP. Decisions: Node + npm install (single-binary deferred), API key + Qubic wallet binding, foundation + discovery + 1 execution path, runtime schema introspection via aigarth schema. Wraps the existing SDK. Distributed as @aigarth/cli. Design: docs/proposals/phase-25-cli.md. The agent-grade framing is the differentiator: JSON by default, versioned schemas, idempotency keys, exit code taxonomy, no interactive prompts.
    8/10/2026, 7:45:18 PM
  • Phase 24 — Hardware node presale (tier 1) — closed. 8/8 tasks, 8/8 SP. Live in code: node_reservations + qubic_usd_rates tables, full lifecycle (24.1); node_escrow double-entry ledger + 4 routes (24.2); usd-price-oracle 60s worker (24.3); qearn-lock wrapper with 5% APY linear accrual (24.4); /nodes marketing page with 4 GPT Image 2 product images, hero + tier 1 spec + 10-item FAQ + Hetzner/AWS/Aigarth compare table + schema.org Product/PreOrder (24.5); /dashboard/nodes reservations page (24.6); operator script for the confirm window with --dry-run and --id flags (24.7); delivery doc (24.8). Vitest: 37/37 passing. Typecheck clean across compute, sdk, web, dashboard. Deferred to Phase 25+ / 20.6: real QPI multisig (escrow table is the audit mirror with synthetic tx_hashes), real Qearn lock (currently linear accrual stub), auto-trigger worker (operator script is the manual path), tier 2 + tier 3 specs (slots in DB only), service-role check on the internal endpoints. Tier 1 USD-anchored: $599 final, $30 deposit (5% ratio), yield opt-in (default off), per-tier sequenced drops (1 → 2 → 3, 14-day windows after mainnet). Source mechanic: Otto One presale, adapted to QUBIC-native two-stage payment.
    8/10/2026, 7:23:05 PM
  • Phase 24 — Hardware node presale (tier 1) — closed. 8/8 tasks, 0.5/0.5 SP. Live in code: node_reservations + qubic_usd_rates tables, full lifecycle (24.1); node_escrow double-entry ledger + 4 routes (24.2); usd-price-oracle 60s worker (24.3); qearn-lock wrapper with 5% APY linear accrual (24.4); /nodes marketing page with 4 GPT Image 2 product images, hero + tier 1 spec + 10-item FAQ + Hetzner/AWS/Aigarth compare table + schema.org Product/PreOrder (24.5); /dashboard/nodes reservations page (24.6); operator script for the confirm window with --dry-run and --id flags (24.7); delivery doc (24.8). Vitest: 37/37 passing. Typecheck clean across compute, sdk, web, dashboard. Deferred to Phase 25+ / 20.6: real QPI multisig (escrow table is the audit mirror with synthetic tx_hashes), real Qearn lock (currently linear accrual stub), auto-trigger worker (operator script is the manual path), tier 2 + tier 3 specs (slots in DB only), service-role check on the internal endpoints. Tier 1 USD-anchored: $599 final, $30 deposit (5% ratio), yield opt-in (default off), per-tier sequenced drops (1 → 2 → 3, 14-day windows after mainnet). Source mechanic: Otto One presale, adapted to QUBIC-native two-stage payment.
    8/10/2026, 7:22:47 PM
  • Phase 24 — Hardware node presale (tier 1) registered. 8 tasks, ~8.5 SP. 24.1 (schema + routes) shipped this run; 27 vitest passing, SDK wired, typecheck clean. 24.2-24.8 in backlog. Design: docs/proposals/phase-24-hardware-presale.md. Source mechanic: Otto One presale, adapted to QUBIC-native two-stage payment with yield opt-in.
    8/10/2026, 3:22:25 AM
  • Phase 15 — Knowledge layer v1 — /blog + /tutorials + /academy surfaces on the dashboard. All three reuse the existing Doc store (SQLite) and a shared hand-rolled markdown renderer extracted from doc-detail.tsx. Markdown files in docs/{blog,tutorials,academy}/ are the source of truth; the dashboard reads them on each render so editing a file is reflected on the next page load (no re-seed step needed). Frontmatter (title / date / author / tags) is parsed by a small YAML-ish reader; bare comma-separated list values are supported for academy lessons. Sidebar nav gets Blog + Tutorials + Academy. Seeded content: 3 blog posts (existing trinary launch + tweet thread + new observability GA post), 2 tutorials (first-stake, first-ann), 2 academy paths (Getting Started with Aigarth, Building ANNs). 22/22 monorepo typecheck clean. v2 scope (deferred): certifications, quizzes + completion tracking, search, authoring UI, versioning.
    8/10/2026, 2:48:40 AM
Next up
Phases about to start
  • 10
    Genesis / IPO
    Capital formation, participation flow, allocation, governance onboarding.
  • 11
    Hardware
    Catalogue, reservations, device management, firmware.
  • 12
    Enterprise
    Multi-tenancy, SSO, compliance, SLAs, dedicated clusters.